Saturday, January 21, 2012

Flooring almost done and date set for the move

Our flooring is almost done and we have set a date for the move now, so just counting down and starting to pack before our big move.

Close-up of the flooring and skirting

Dining area

Kitchen (ignore the crap on the counter)

Bedroom 3 (the flooring is not complete yet)

Toilet

Study

Theatre

Our room

Sunday, January 15, 2012

House completed, keys collected

Yes, our house is ready! We've collected the keys on Friday, so that we can arrange the flooring, lighting, window treatments and other miscellaneous items done before we shift in, which should be in a couple of month's time.

Here's what it looks like.








Tuesday, September 6, 2011

Roofing complete

This was from our visit to the site two weeks ago. Can't believe how fast they are working. The roof is complete, internal walls have been plastered. Looks like the house will be ready soon.

Garage.

Entry leading to the dining and living area.

What our roof looks like on the inside.

Oven and microwave recess in the kitchen.

Living area.

Second bedroom.

Master bedroom.

Theatre.

Theatre facing the main street.

Corridor.

Study.

Dining area.

Kitchen.

Fridge recess.


Facade.

Alfresco. They have also started work on our neighbour's lot.

Sunday, September 4, 2011

Brickwork complete

Apologies for the late posting. This was meant to have been posted a month ago!

This was the progress when we visited the site on 6 August.

Garage.

Laundry.

Linen closet.

Dining area.

Living area.

Kitchen.

Fridge, microwave and oven recesses, and the pantry

Master bedroom.

Ensuite.

Theatre (which was labelled in the plans as the study).

Study (which was labelled in the plans as the theatre).

Entrance.

The long corridor from the entrance.

Second bathroom and toilet.

Second bedroom.

Third bedroom.

Walk-in wardrobe for the third bedroom. The second bedroom will also have a similar walk-in wardrobe.

Al-fresco.

Facade.