Tuesday, September 6, 2011

Roofing complete

This was from our visit to the site two weeks ago. Can't believe how fast they are working. The roof is complete, internal walls have been plastered. Looks like the house will be ready soon.

Garage.

Entry leading to the dining and living area.

What our roof looks like on the inside.

Oven and microwave recess in the kitchen.

Living area.

Second bedroom.

Master bedroom.

Theatre.

Theatre facing the main street.

Corridor.

Study.

Dining area.

Kitchen.

Fridge recess.


Facade.

Alfresco. They have also started work on our neighbour's lot.

Sunday, September 4, 2011

Brickwork complete

Apologies for the late posting. This was meant to have been posted a month ago!

This was the progress when we visited the site on 6 August.

Garage.

Laundry.

Linen closet.

Dining area.

Living area.

Kitchen.

Fridge, microwave and oven recesses, and the pantry

Master bedroom.

Ensuite.

Theatre (which was labelled in the plans as the study).

Study (which was labelled in the plans as the theatre).

Entrance.

The long corridor from the entrance.

Second bathroom and toilet.

Second bedroom.

Third bedroom.

Walk-in wardrobe for the third bedroom. The second bedroom will also have a similar walk-in wardrobe.

Al-fresco.

Facade.